- Sputnik International
World
Get the latest news from around the world, live coverage, off-beat stories, features and analysis.

US Navy Considered $1 Billion Plan for Breaking Down Old Nuclear-Powered Carrier

© AP Photo / Petros GiannakourisUSS Enterprise, 5th Fleet, near the coast of Athens, 2012.
USS Enterprise, 5th Fleet, near the coast of Athens, 2012. - Sputnik International
Subscribe
The US Navy has yet to choose a way forward for dismantling the USS Enterprise aircraft carrier. The delay has been motivated in part by the fact that disposing of the nuclear-powered craft could cost more than $1 billion ‒ a pill the Navy is loathe to swallow.

The Government Accountability Office published a report Thursday indicating that in 2013 "the Navy's cost estimate for the shipyard" in Puget Sound, Washington, "to perform all [USS Enterprise] dismantlement and disposal activities increased — from a range of $500 million to $750 million — to well over $1 billion."

This file photo taken on Monday, Feb. 13, 2012 shows a U.S. F-18 fighter jet, left, land on the Nimitz-class aircraft carrier USS Abraham Lincoln (CVN 72) as a U.S. destroyer sells on alongside during fly exercises in the Persian Gulf - Sputnik International
Iran's Zarif Blasts US Gulf Buildup, Notes US Navy Over 7,000 Miles From Home

As a result of this rather significant expense — about 25 percent of what it cost to build the ship in 1958 in inflation-adjusted terms — the Navy decided to ditch the plans. As the ship, built between 1958 and 1961, was the world's first nuclear-powered aircraft carrier, the government wants to take special care in dismantling it and must comply with stringent guidelines set in place by nuclear regulation bodies separate from the Navy.

There is also a policy precedent to be set by how the carrier is deconstructed, in terms of "the processes, costs and oversight that may be used to dismantle and dispose of nuclear-powered aircraft carriers in the future." Specifically, the manner in which the Enterprise is disposed of will set an example for how to do the same thing with the US Navy's aging fleet of Nimitz-class carriers.

One of the thornier issues when it comes to disposal of the carrier is what to do with the nuclear waste produced by its propulsion generators. In 2016, the Navy thought it would have commercial contractors bid for contracts to break down the non-nuclear parts of the ship — everything except what's referred to as the propulsion space section.

The Navy aircraft carrier USS Enterprise rests at the pier as it is gutted before being official decommissioned at Naval Station Norfolk in Norfolk, Virginia, May 8, 2013, during the Department of Defense's tour deemed Navy 101 - Sputnik International
US Navy Struggles to Dispose of First Nuclear Aircraft Carrier

As GAO conducted its study, the Navy decided to ditch this plan. Instead, the Navy is now considering two options for the USS Enterprise, the watchdog noted. One route would be to do most of the deconstruction in Puget Sound, and then dump the nuclear waste at the US Department of Energy's Hanford Site in southeastern Washington state. The other route is for commercial contractors to do all the dismantling. There is no estimate provided in GAO's report for how much each of these routes would cost the US Navy, and by extension US taxpayers.

Under the 100 percent commercial dismantling route, the US Navy needs to coordinate with the Nuclear Regulatory Commission (NRC), which has regulatory jurisdiction over the private nuclear industry, the GAO said. The Pentagon agreed with this recommendation, Stars and Stripes reported Friday.

Newsfeed
0
To participate in the discussion
log in or register
loader
Chats
Заголовок открываемого материала